Dongguan Jingui Electronic Technology Co., Ltd.
|
Gold Index: 7273
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
High Output Open Mill Rubber Mixing / Double Roll Rubber Making Machine
I. Machine Introduction:
1. The roll nip of the mixing mill can be adjusted by using manual or electrical mode
2. To ensure the safety of staff and equipment, we install convenient button for emergency.
3. All the mixing mills we provide to you are checked through 8 hours non stop full load
operation, customers can use them immediately after installation.
II. Main Structure:
This is a double roll rubber marking machine. It consists of roller , frame , blame
adjustable pitch device , driving device , emergency stop device , baffle plate device ,
heating and cooling device , electrical system etc .
III. Main Parameters:
|
Item |
XK-360 |
Roll diameter |
mm |
360 |
Roll working length |
|
900 |
Front roll linear speed |
r/min |
16.7 |
Speed ratio of rolls |
|
01: 01.25 |
Max roll space |
mm |
10 |
Compound feeding capacity |
kg |
20-25 |
Motor power |
kW |
30 |
Dimensions(L× W× H) |
|
|
L |
mm |
4200 |
W |
mm |
1780 |
H |
mm |
1760 |
Gross weight |
T |
~6.5 |
IV. Operate Steps:
1. Turned on the power, check the machine no load operation is normal or not, as usual, and
then continue to work.
2. Access trays placed Fortunately workbench.
3. Set the temperature and rotational speed of the front and rear rollers.
4. When the temperature reaches the set temperature, refining the material to be put into
blocking Plate between refining.
5. By hand wheel adjustment the gap between the two rolls to obtain products of different
thickness, and Adjusting the distance between the two retaining plate to adjust the product
width.
6. Refining completed, clean the machine, turn off the power.
V. FAQ
1Q: Any discount possible if I place an order?
A:Yes.we have different price ranges (discounts) based on different order quantities.Please contact our sales girl for detailed price information.
2Q:what is MOQ?
A: 1 Set.
3Q:How long is the delivery time?
A: Normally within 30 days after confirming the order ,Different products and quantities have different procedures and different timing.We may promise that we can try our best to finish all of your orders within the shortest time.For more information,please contact us directly.
There are full transportation insurance for the machine.
4Q:Are customized products accepted?
A:Your idea, your choice, we design, we make.The flexible design system can satisfy customers,
special design requirements within the shortest time. A load test running will be made to the
assembled equipment in our company to save degugging for customer.
5Q:More information about payment terms?
A:We can accept Paypal,T/T and Western Union for money transfer and cash.
6Q:What is the package?
A:Wooden case.
Dongguan Jingui Electronic Technology Co., Ltd. [China (Mainland)]
Business Type:Manufacturer
City: Dongguan
Province/State: Guangdong
Country/Region: China (Mainland)